Engineering & Industry Notes

EV charging blog: field-tested notes on hardware, software, and deployment.

Practical posts from the MÖTEN evfc engineering team for site hosts, buyers and installers, written for the US with notes for Canada. Just what we'd tell you over coffee: the math, the trade-offs, and the questions to ask.

Showing 18 posts
Software Nov 5, 2026

Automated settlement for EV charging: how site owners get paid.

Automated settlement for EV charging: matching sessions to cleared payments, holds, refunds, complimentary sessions, statements and site-owner payouts.

8 min read Read post
Installation Nov 5, 2026

EV charger installation timeline: permits, utility and commissioning.

EV charger installation timeline for commercial sites: permits, rebates, utility service, lead times, inspection and commissioning, and what causes delays.

8 min read Read post
Installation Nov 5, 2026

Accessible EV charging: how to design stations everyone can use.

Accessible EV charging for site hosts: Access Board reach ranges, access aisles, cable management, screens, payment and signage, plus a note for Canada.

8 min read Read post
Engineering Nov 5, 2026

EV charger uptime: a maintenance plan that keeps stations working.

EV charger uptime for site hosts: why chargers go down, a preventive maintenance checklist, remote monitoring, spare parts and how to measure uptime.

7 min read Read post
Buying Guide Nov 5, 2026

How to price EV charging: per kWh, per hour, session and idle fees.

How to price EV charging at a commercial site: per kWh, per hour, session and idle fees, where kWh billing is allowed, and how to cover demand charges.

9 min read Read post
Standards Nov 5, 2026

NACS vs CCS for site hosts: which connectors to install now.

NACS vs CCS for site hosts: where SAE J3400 stands in 2026, which EVs use each plug, adapters, dual-cable DC chargers, and which connectors to install now.

7 min read Read post
Buying Guide Jun 23, 2026

EV charging for gas stations: demand charges, dwell, and battery buffering.

Forecourt dwell is short, so DC fast fits. How dwell-aware sizing and XEYAR battery buffering keep demand charges from sinking a forecourt deployment.

7 min read Read post
Buying Guide Jun 16, 2026

Hotel EV charging: why overnight Level 2 beats DC fast.

Guests park 8 to 12 hours, so a wall of DC fast is wasted money. Size Level 2 to room count, and let eMÖTEN handle guest access and billing on MÖTEN hardware.

6 min read Read post
Buying Guide Jun 9, 2026

Workplace EV charging: sizing ports to your commuter mix.

You rarely need one port per EV. How to size Level 2 to your commuter mix, stage installs, and use load management to defer a service upgrade.

5 min read Read post
Engineering Jun 2, 2026

Fleet EV charging at the depot: matching charger count to your duty cycle.

Depot vehicles charge on a known schedule, so you can sequence power instead of buying it all at once. Duty-cycle math, load management, and XEYAR buffering.

5 min read Read post
Software May 26, 2026

Multifamily EV charging: solving who pays for the power.

The hard part is billing the right resident for the right kilowatt-hours. How eMÖTEN per-driver attribution on MÖTEN chargers handles cost recovery cleanly.

5 min read Read post
Installation May 19, 2026

School EV charging: day-use Level 2 and an overnight bus depot on one service.

Two charging problems on one site: daytime staff and visitor Level 2, and overnight DC for buses. How to plan one service for both loads.

4 min read Read post
Engineering May 2, 2026

EV charging without panel upgrade work: how XEYAR battery-buffered clusters do it.

How a XEYAR battery-buffered cluster runs DC fast charging on an existing service: the shared DC bus, the battery that covers peaks, and the limits.

8 min read Read post
Standards Apr 28, 2026

OCPP 1.6 vs 2.0.1: what actually changes for site operators.

Smart charging profiles, ISO 15118 support, device management and security: what changed between OCPP versions and which features matter on site.

5 min read Read post
Rebates Apr 21, 2026

How to apply for an EV charger rebate: the 5 fields to read first.

Cap, eligibility class, equipment list, paperwork window, and stack-ability: how to read a US state or utility program, and the order to apply in.

5 min read Read post
Buying Guide Apr 14, 2026

Level 2 vs DC fast charging: choose by dwell time, not by kW.

A 7.7 kW Level 2 port delivers a full overnight charge at a hotel for a fraction of the cost of DC fast. How to size against dwell time, not headline output.

6 min read Read post
Software Apr 7, 2026

Free EV charging software on MÖTEN chargers: what it covers.

What eMÖTEN CMS covers on MÖTEN chargers: the network, eMÖTEN Power load management and eMÖTEN Pay settlement, with no CMS subscription.

6 min read Read post
Installation Mar 31, 2026

EV charger site assessment checklist: 12 things to confirm before you order.

Service capacity, conduit run, mounting, signage, ADA, and more. The 12-point checklist our engineering team walks every site through before a PO goes out.

7 min read Read post

No posts in this category yet. Show all posts

Subscribe

New posts, when they ship, in your inbox.

Engineering posts, buying guides, and rebate updates for US sites, emailed when they ship. No marketing drip campaigns.

Only when a new post ships · unsubscribe any time
Got a Topic in Mind?

Have something you want us to write about?

If there's a deployment scenario, standard, or product question we haven't covered, send it. The blog is driven by what buyers and installers actually ask, not by a content calendar.