Practical posts from the MÖTEN evfc engineering team for site hosts, buyers and installers, written for the US with notes for Canada. Just what we'd tell you over coffee: the math, the trade-offs, and the questions to ask.
Automated settlement for EV charging: matching sessions to cleared payments, holds, refunds, complimentary sessions, statements and site-owner payouts.
EV charger installation timeline for commercial sites: permits, rebates, utility service, lead times, inspection and commissioning, and what causes delays.
Accessible EV charging for site hosts: Access Board reach ranges, access aisles, cable management, screens, payment and signage, plus a note for Canada.
EV charger uptime for site hosts: why chargers go down, a preventive maintenance checklist, remote monitoring, spare parts and how to measure uptime.
How to price EV charging at a commercial site: per kWh, per hour, session and idle fees, where kWh billing is allowed, and how to cover demand charges.
NACS vs CCS for site hosts: where SAE J3400 stands in 2026, which EVs use each plug, adapters, dual-cable DC chargers, and which connectors to install now.
Forecourt dwell is short, so DC fast fits. How dwell-aware sizing and XEYAR battery buffering keep demand charges from sinking a forecourt deployment.
Guests park 8 to 12 hours, so a wall of DC fast is wasted money. Size Level 2 to room count, and let eMÖTEN handle guest access and billing on MÖTEN hardware.
You rarely need one port per EV. How to size Level 2 to your commuter mix, stage installs, and use load management to defer a service upgrade.
Depot vehicles charge on a known schedule, so you can sequence power instead of buying it all at once. Duty-cycle math, load management, and XEYAR buffering.
The hard part is billing the right resident for the right kilowatt-hours. How eMÖTEN per-driver attribution on MÖTEN chargers handles cost recovery cleanly.
Two charging problems on one site: daytime staff and visitor Level 2, and overnight DC for buses. How to plan one service for both loads.
How a XEYAR battery-buffered cluster runs DC fast charging on an existing service: the shared DC bus, the battery that covers peaks, and the limits.
Smart charging profiles, ISO 15118 support, device management and security: what changed between OCPP versions and which features matter on site.
Cap, eligibility class, equipment list, paperwork window, and stack-ability: how to read a US state or utility program, and the order to apply in.
A 7.7 kW Level 2 port delivers a full overnight charge at a hotel for a fraction of the cost of DC fast. How to size against dwell time, not headline output.
What eMÖTEN CMS covers on MÖTEN chargers: the network, eMÖTEN Power load management and eMÖTEN Pay settlement, with no CMS subscription.
Service capacity, conduit run, mounting, signage, ADA, and more. The 12-point checklist our engineering team walks every site through before a PO goes out.
No posts in this category yet. Show all posts
Engineering posts, buying guides, and rebate updates for US sites, emailed when they ship. No marketing drip campaigns.
Only when a new post ships · unsubscribe any timeTapping a tile filters the post grid above.
XEYAR architecture, dynamic load management, depot sizing, uptime and maintenance.
Filter postsOCPP versions, NACS vs CCS connectors, ISO 15118, safety certification.
Filter postsState programs, utility make-ready, local incentives, how to apply.
Filter postsL2 vs DC fast, dwell-time logic, pricing models, site types.
Filter postseMÖTEN CMS, eMÖTEN Pay settlement, billing, reporting.
Filter postsSite assessment, accessible design, permits, utility, commissioning.
Filter postsIf there's a deployment scenario, standard, or product question we haven't covered, send it. The blog is driven by what buyers and installers actually ask, not by a content calendar.