Real Problems · Engineered Solutions

EV Charging Solutions Built for the Sites Others Won’t Touch.

Grid constraints, indoor parking restrictions, fleet mandates, multi-dwelling building boards, off-grid communities, MÖTEN evfc has a patented, certified, deploy-in-weeks solution for every charging problem the industry calls “impossible.” No transformer upgrades, no monthly fees on MÖTEN chargers, no vendor lock-in.

20+
Ports on Existing Service
via XEYAR cluster
$0
CMS Fees on MÖTEN
free for life on MÖTEN chargers
100%
Revenue to Owner
on MÖTEN public chargers
4–6 wk
DCFC Deployment
vs 12–24 mo conventional
What we solve

Six engineered solutions to the problems that gate every project.

Grid Constraint Solution

No Electrical Upgrade Required

Deploy 8–20+ ports on your existing electrical service. The patented XEYAR shared-DC-bus cluster stores off-peak energy in a non-thermal-runaway buffer and delivers it at multiples of the grid rating, eliminating the transformer upgrade, feeder reinforcement, and 12–24 month interconnection study that gate most projects.

  • Operates from −40°C to +60°C
  • Na-ion or supercapacitor buffer, both non-thermal-runaway
  • USPTO patent pending · 39 hardware claims
Product: XEYAR Battery-Buffered Cluster
Explore Buffered Systems
Monetization Solution

Revenue Generation

Turn parking into a profit center. PHOENIX and DRACO commercial chargers accept contactless card, tap-to-pay, regional debit networks, QR mobile checkout, and the eMÖTEN app. Owners on MÖTEN chargers keep 100% of every transaction, no transaction fees, no network cut, no monthly platform fees.

  • $0 transaction fees on MÖTEN chargers
  • Tap, card, mobile wallet, regional debit, QR
  • Tax-compliant receipts · revenue dashboard included
Products: PHOENIX · DRACO · XEYAR
Explore Commercial L2
Fleet Solution

Fleet Electrification

Municipal fleets, courier depots, transit agencies, and corporate EV fleets. Per-vehicle RFID, scheduled overnight charging, dynamic load balancing, and per-vehicle cost reporting. Scale from a 2-port pilot to 200+ ports across multiple sites, all under one OCPP 1.6, 2.0 ready platform.

  • Ready for 2030 fleet electrification mandates
  • Per-vehicle cost & energy reporting in eMÖTEN CMS
  • OCPP 1.6, 2.0 ready, no vendor lock-in
Products: LYNX · BOÖTES · DRACO · XEYAR
Explore Fleet Solutions
Multi-Dwelling Solution

Strata, MURB & Multi-Dwelling Units

The #1 reason MDU and strata projects stall is electrical capacity. The XEYAR buffered cluster lets you deploy 8–20 ports per building with no panel upgrade, no fire-suppression upgrade, and individual sub-metering per suite or unit, bypassing the most contentious board votes entirely.

  • Indoor parkade code-compliant (NFPA 855, IBC, IFC)
  • Individual sub-metering per suite
  • No board vote on electrical capacity required
Products: XEYAR Cluster · LYNX · BOÖTES
Explore MDU Solutions
Funding Solution

Incentives & Rebate Stacking

MÖTEN evfc hardware is engineered to qualify for the federal, state, and utility EV-charging incentive programs available across the US, including NEVI, CFI, the 30C tax credit, and state EVSE rebate programs. Pre-approval reduces application friction and accelerates funding. Our team helps structure projects to maximize stacked funding across every available program.

  • UL, ETL, ENERGY STAR, FCC, NACS, OCPP 1.6
  • Application support included with every project
  • State-by-state rebate map maintained continuously
Coverage: US federal · 50 states · utility programs
View Incentives For Your Region
Remote & Off-Grid Solution

Remote, Off-Grid & Underserved Communities

Arctic-rated XEYAR Na-ion buffered systems operate reliably off-grid, on weak grids, or behind unreliable utility service. Multi-source 120–600V AC input accepts solar PV, wind, generator, and grid simultaneously. Dedicated US funding streams support Tribal, rural, and underserved-community deployments through DOE, USDA REAP, and Tribal Energy programs.

  • Off-grid capable Na-ion buffer · rated to −40°C
  • Multi-source: solar · wind · generator · grid
  • Dedicated US Tribal & rural community funding programs
Product: XEYAR Na-ion Buffered Cluster
Explore Off-Grid Solutions
How we deliver

From inquiry to charging in 4 steps.

We handle the engineering, certifications, and incentive paperwork, you focus on your business.

Free Site Assessment

We assess your electrical service, parking layout, and incentive eligibility, at no cost, no obligation.

Engineered Quote & Rebate Map

Full project quote in USD, with every applicable federal, state, and utility rebate identified.

Certified Install

Hardware ships from regional warehouses. Certified installer network handles civil works, commissioning, and CMS onboarding.

Live & Earning

Site goes live. Revenue flows 100% to you on MÖTEN chargers. eMÖTEN CMS monitors uptime, sessions, and performance 24/7.

Match products to problems

Which MÖTEN evfc product solves which problem.

Five product families, six solutions. Use this matrix to short-list the families that fit your project, then drill into the spec sheets.

Product Family No Grid
Upgrade
Revenue
Generation
Fleet MDU /
Strata
Off-Grid /
Remote
BOÖTES Residential L1/L2 · 16–48 A ~
LYNX Commercial L2 · 32–80 A ~
PHOENIX Pedestal L2 · payment-enabled
DRACO DC fast · 30–180 kW ~ ~
XEYAR Battery-buffered cluster · up to 720 kW/port
Best fit Partial / use-case dependent Not applicable
Trusted on the ground

Real sites. Real owners. Real revenue.

Operators who said yes when others said “wait for the utility.”

MÖTEN evfc got us live before our utility study would have even started. The cluster sits on our existing service, and every session goes straight to our bottom line on our MÖTEN chargers, no CMS fee skimming our revenue.

Amin

Owner-operator · Quality Inn, Southampton ON

We added DC fast charging on the same service that runs the pumps. No transformer, no 18-month interconnection. The MÖTEN team handled the rebate paperwork end-to-end and the eMÖTEN platform runs the site for us 24/7.

Raja

Site owner · ESSO Chatsworth ON

3-year
Parts & Labor Warranty
24/7
eMÖTEN Monitoring
50
US States Served
USPTO
Patent-Pending Cluster
Frequently asked

The questions buyers ask before they sign.

If yours isn’t answered here, our engineering team will respond within one business day.

How does MÖTEN evfc let us deploy EV charging without a panel upgrade?

The XEYAR battery-buffered cluster draws a continuous low-rate trickle charge from a standard service (typically 100A × 480V, ~83 kW), stores energy in a non-thermal-runaway buffer (Na-ion or supercapacitor, chosen per project), and discharges it at multiples of the grid rating when vehicles plug in. The grid never sees the burst. A single 100A service that previously supported one Level 2 stall can now drive a 4-port, 240 kW per port DCFC site. No transformer upgrade, no 12–24 month utility interconnection study.

What does “$0 CMS fees for life” actually mean?

The eMÖTEN Charger Management System is included free with every MÖTEN charger, with no monthly subscription, no per-port fees, and no transaction cuts, for the operational life of the hardware. This applies only to MÖTEN chargers; we do not offer free CMS service for third-party hardware. Revenue from public-facing chargers flows 100% to the site owner.

Which incentive programs is MÖTEN evfc hardware eligible for?

MÖTEN evfc hardware is engineered to meet the certification requirements (UL, ETL, ENERGY STAR, FCC, NACS, OCPP 1.6, 2.0 ready) that qualify it for the major federal, state, and utility EV charging incentive programs in the United States, including the federal NEVI Formula Program, the CFI Discretionary Grant Program, the 30C Alternative Fuel Vehicle Refueling Property Credit, state-level EVSE rebate programs (CA, NY, NJ, MA, IL, CO, WA, OR, and others), and utility-led make-ready and rebate programs. Our team helps structure projects to maximize stacked funding across federal, state, and utility programs.

Is MÖTEN evfc hardware safe for indoor and underground parking?

Yes, when configured with the supercapacitor buffer (and with Na-ion in markets where the chemistry has UL 9540A Pass acceptance for indoor deployment). Both chemistries used in the XEYAR cluster are non-thermal-runaway, meeting NFPA 855, IBC, IFC, NEC Article 706, and CSA requirements for indoor and multi-unit residential deployment without dedicated fire suppression infrastructure. This is the regulatory edge that enables MURB, strata, condo, and underground-parking deployments where lithium-iron-phosphate DCFC is restricted by fire code.

How long does deployment take?

Level 2 sites with existing service typically deploy in 2–4 weeks (site survey to commissioning). XEYAR battery-buffered DCFC sites typically deploy in 4–6 weeks where the existing 100A service is already in place, because the schedule is dominated by site civil works rather than utility interconnection. Compare this to 12–24 months for conventional DCFC at the same per-port power rating, where the entire schedule is gated by transformer procurement and utility study queues.

Can MÖTEN evfc serve fleets of more than 100 vehicles?

Yes. The eMÖTEN CMS is architected for fleet operations from a 2-port pilot to 200+ ports across multiple sites. Per-vehicle RFID access, scheduled overnight charging, dynamic load balancing across the cluster, and per-vehicle cost reporting are all native features. The OCPP 1.6, 2.0 ready protocol means there is no vendor lock-in, you own your data and can change CMS providers without changing hardware.

What payment methods do MÖTEN evfc commercial chargers accept?

PHOENIX and DRACO commercial-tier chargers accept contactless card (Visa, Mastercard, American Express, Discover), tap-to-pay (Apple Pay, Google Pay, Samsung Pay), QR-code mobile checkout, and the eMÖTEN mobile app. Receipts are emailed automatically with applicable US state and local sales tax line items. Owners on MÖTEN chargers keep 100% of revenue, there are no transaction fees, no network cut, and no monthly platform fees.

Can I keep my existing CMS or migrate to a different one later?

Yes, MÖTEN evfc hardware is OCPP 1.6, 2.0 ready. You can connect MÖTEN chargers to any third-party OCPP-compliant CMS (ChargePoint, Driivz, AmpUp, etc.), or you can use the included eMÖTEN CMS for free on MÖTEN chargers. There is no lock-in: switching CMS providers does not require changing hardware. Your historical data is exportable in standard formats.

Free site assessment · engineered quote · no obligation

Stop waiting on the utility. Start charging in weeks.

Every MÖTEN evfc project starts with a free site engineering consultation. Share your site profile, vehicle mix, expected session pattern, and existing service, we’ll run the sizing model, identify every applicable incentive in your region, and propose the right cluster tier and chemistry.

Become an installer
USPTO patent pending UL 9540 3rd Ed. OCPP 1.6, 2.0 ready US-based · ships from US