Commercial EV charger installation, across all 50 states.
Commercial EV charger installation with one team and one accountable contract, end to end. MÖTEN engineering
paired with vetted local trades in every state we serve. From a
single Level 2 stall to a battery-buffered DC fast corridor, site assessment to
commissioning, in writing, on schedule.
All 50 states · ETL Certified
Engineering-led, locally executed
Fixed-fee estimate in 2 business days
Why MÖTEN
Engineering you can trust. Trades that know your code.
Most installers are generalists with a charger catalogue. We are the manufacturer
and the integrator. Every project is engineered by the same team that designed the
hardware, then executed by licensed local trades vetted to our standard.
One team, one contract
You sign one fixed-fee agreement covering site assessment, engineering, permits,
installation, and commissioning. No subcontractor finger-pointing.
Your MÖTEN project manager is your single point of accountability from quote to
go-live.
Engineered by the people who built the hardware
Our engineering team designs the MÖTEN Level 2, DC fast and XEYAR battery-buffered product lines.
When they design your installation, they are designing for hardware they know
down to the bus bar. No translation loss between manufacturer and installer.
Vetted local trades in every state
Permits, code, and utilities are local, so the hands on the conduit should be too.
We partner with licensed electrical and civil contractors in every state we serve,
vetted on safety record, certifications, and prior EV work. Local fluency,
MÖTEN standards.
Live and earning, monitored from day one
Commissioning includes activation of the eMÖTEN Charger Management System on
MÖTEN chargers: uptime monitoring, OCPP integration, and revenue dashboards
configured before we hand over the keys. You leave the project live, not
waiting for a software call.
Service Tiers
Three tiers. One free quote.
Every project is unique, but most fall cleanly into one of three tiers. Tell us your
site and we will tell you which tier fits, with a fixed-fee estimate in 2 business days.
Tier 1
Basic
Single port to small Level 2 array within reach of an existing panel.
No-cost quote
Typical timeline: 1–3 days on site
Remote site assessment at no cost
1–4 Level 2 ports
Existing panel capacity (no upgrade)
Wall-mount or single pedestal
Commissioning & CMS activation
Permits & rebates (add-on)
Best fit
Single-family home, small office, light commercial: anywhere with spare panel
capacity and a wall to mount on.
Free quote · Fixed fee · 2-business-day turnaround. Tell us about
your site once. We confirm the right tier and lock the price in writing, so you can
compare like for like.
Our Process
From request to live, in seven steps.
A turnkey delivery model with no surprises. Each step has a named owner on our
side, a written deliverable, and a fixed timeline.
1
Request
Tell us your site, your goal, and what hardware you are considering.
Day 0
2
Site Assessment
Remote review of panel, layout, utility bill, and rebates. On-site visit for Complex.
Day 1–2
3
Fixed-Fee Estimate
Tier confirmed, configuration recommended, price locked in writing.
Chargers, panels, and BESS shipped to site. Ship-when-ready, not ship-and-wait.
Pre-install
6
Install
Vetted local trades execute under MÖTEN engineering supervision.
1 day–16 wk
7
Commission & Live
Inspection, eMÖTEN CMS activation, charging tests, written commissioning report.
Final 1–2 days
Nationwide Coverage
We install where you operate.
Our model is intentionally nationwide. MÖTEN engineering and project
management is centralised, the same playbook, the same standards,
the same documentation, on every project. On-site work is done by local, certified and licensed electricians
who know your state code, your utility, and your permitting authority, and who
handle the permits.
We take on projects in all 50 US states, grouped into
four regions: West, Mountain & Plains,
Midwest & South, and Northeast. Every installation uses ETL Certified
hardware, with state and utility incentive paperwork prepared as part of the project scope
where a program applies (see rebates by state).
One software bill, gone. The eMÖTEN Charger Management System is
included with every MÖTEN charger, no monthly subscription, activated as
part of commissioning.
Frequently Asked
Questions, answered straight.
The most common questions we get from procurement teams, fleet managers, and
property owners during the first conversation.
Do you really install EV chargers across all 50 states?
Yes. We deliver projects across all 50 US states. Our model pairs MÖTEN
engineering with vetted local electrical and civil trades in each market. The
engineering, project management, and commissioning are run by us; the on-site
work is done by certified, licensed electricians who know your state code, your local
utility, and your permitting authority, and who handle the permits.
What is included in the free site assessment?
We review your electrical service capacity, parking layout, vehicle and
dwell-time profile, utility account, available rebates and incentives, and any
code or HOA constraints. You receive a written assessment with a recommended
configuration and a fixed-fee installation estimate. Most assessments are
completed remotely from photos, drawings, and a utility bill; site visits are
scheduled for Complex tier projects.
What is the difference between Basic, Standard, and Complex installations?
Basic covers single-port or small Level 2 arrays within reach of an existing panel,
typically 1 to 3 days on site. Standard covers multi-port Level 2 arrays
with a dedicated subpanel, permits, and utility coordination, typically 1
to 3 weeks. Complex covers DC fast charging, battery-buffered clusters,
transformer or service upgrades, and civil works, typically 6 to 16 weeks.
Your free quote identifies the right tier.
How quickly can you start a project?
Basic and Standard installations typically start within 2 to 4 weeks of a signed
estimate. Complex projects depend on permitting and utility lead times in your
jurisdiction; we begin engineering and submittals immediately on signature so the
on-site work can start the moment approvals land.
Do you handle permits, utility coordination, and rebate applications?
Yes, these are included in Standard and Complex tiers and available as
add-ons for Basic. Our project managers prepare and submit electrical permits,
coordinate with the utility on service capacity and meter changes, and prepare
rebate or incentive applications where they apply in your state.
What chargers can you install?
Our installation crews are trained on the full MÖTEN range: Level 2
chargers, pedestals, DC fast chargers, and battery-buffered clusters, and
we can install third-party hardware where required. The eMÖTEN Charger Management
System ships included with every MÖTEN charger and is activated as part of
commissioning at no additional cost.
What does commissioning include?
Final electrical inspection sign-off, charger network onboarding, OCPP
integration, payment terminal activation where applicable, eMÖTEN CMS
configuration, load and end-to-end charging tests, driver-app pairing, and a
written commissioning report. Your site is left live, earning, and monitored.
How much does commercial EV charger installation cost?
EV charger installation cost depends on your site, so we quote a fixed fee after the site assessment instead of
publishing a rate card. The biggest cost drivers are spare panel capacity (a Basic install with no panel
upgrade costs far less than a service or transformer upgrade), the distance and surface between the panel and
the parking spots (trenching and concrete add cost), the number of ports, the mounting (wall, pedestal or
bollard), permit and utility fees in your area, and any rebate that offsets part of the bill. A battery-buffered
XEYAR cluster can avoid a utility service upgrade at sites where the grid connection is the limit.
What warranty and post-install support do you offer?
Every MÖTEN product carries a 2-year manufacturer warranty (Battery Buffered batteries 10 years). Installation
workmanship is warranted for 12 months as standard, extendable to 24 or 36 months.
eMÖTEN CMS provides continuous remote monitoring with email and dashboard alerts;
on-site service contracts are available in every state we operate in.
Question we did not answer? The fastest way to get a real answer is a free site assessment.