Patent Pending · USPTO
About MÖTEN evfc

Built to last.
Built for the United States.

We’re EVFastCharge Ltd., the company behind MÖTEN evfc: certified Level 2 chargers, DC fast chargers, patent-pending battery-buffered clusters, and the proprietary eMÖTEN CMS. Designed in North America, shipped across all 50 US states, and built on one principle: you own your infrastructure, not your vendor.

50states
Coverage across the United States
$0/mo
CMS fee on MÖTEN chargers, for life
48h
Standard ship time, regional warehouses
3yr+
Standard hardware warranty, every SKU
Why we built this

The EV charging industry was set up to charge you twice.

Once for the hardware. Then forever for the software, the network, and the right to use what you already own.

Every EV charger needs a Charger Management System (CMS) to do anything useful, pricing, payments, access control, reporting, OCPP integration. Most vendors bundle the hardware at a competitive price, then bill you $15–$30 per port per month, forever, for the software. They take a cut of every transaction. They lock the firmware. And the moment you try to leave, your hardware turns into a paperweight.

We started MÖTEN evfc on a different premise: infrastructure should belong to the people who pay for it. So we built our own CMS, eMÖTEN CMS, and bundled it free with every charger we ship. No monthly fee. No transaction cut. No proprietary lock-in. We compete on the hardware, the software, and the support, not on hostage-taking.

That decision shaped everything else. It’s why we engineer for OCPP open standards. It’s why we publish honest USD pricing across all 50 states with NEVI and Buy America compliance flagged on every SKU. It’s why our patent-pending battery-buffered clusters let small electrical services support 8–20 charging ports without a utility upgrade. And it’s why our customers stay, not because they’re trapped, but because they don’t want to leave.

If you have to lock your customers in to keep them, you don’t have customers. You have hostages.

· The MÖTEN evfc operating principle

What we set out to fix

Five things the industry got wrong.

  • Mandatory monthly CMS fees. $15–$30/port/month forever, on hardware you already paid for.
  • Proprietary firmware lock-in. Switch vendors and your chargers stop working. Closed protocols by design.
  • Transaction take-rates. 5–15% of every kWh sold goes to the network, not the site host.
  • Grid-upgrade gatekeeping. “You need 800A service” pushes deployments past financial viability.
  • Unprovable warranty claims. “3-year warranty” with conditions that void the moment you file.
MÖTEN evfc exists because none of these had to be true.
What we stand for

Mission, vision, and the three principles we won’t bend on.

Most company values pages are decoration. Ours actually decide product calls. If a feature breaks one of these, it doesn’t ship.

Our Mission

Make charging infrastructure that’s actually profitable, not just possible.

We exist to put the economics of EV charging back in the hands of site owners, fleet operators, property managers, and homeowners. That means certified hardware at honest prices, software included for life on every MÖTEN charger, and infrastructure that earns, not bleeds.

Our Vision

A world where charging an EV is as simple, open, and ownable as plugging in a fridge.

No subscription to make it work. No proprietary plug. No vendor permission slip. Just standard hardware, open protocols (OCPP 1.6, 2.0 ready), and software that respects the people who paid for it. That’s the future we’re building toward, one site at a time, across all 50 states and counting.

The three principles

If a feature breaks one of these, it doesn’t ship.

PRINCIPLE 01

Honesty in numbers.

Every spec we publish is third-party verifiable. Every “free” claim names what it’s free on. Every price is in your local currency. We don’t round up uptime, round down warranty fine print, or use weasel words.

PRINCIPLE 02

Open by default.

Open Charge Point Protocol on every charger, every firmware. Open API on the CMS. Open documentation. If you ever want to leave us, take your hardware with you, it will work on any OCPP-compliant network. The lock-in stops here.

PRINCIPLE 03

You own what you buy.

Once you take delivery, the hardware is yours. The data is yours. The revenue is yours. We don’t hold firmware hostage, take a cut of your kWh sales, or charge for software access on MÖTEN chargers. Buying from us means owning, not renting forever.

What we build

Four product lines. One platform.

Every charger we ship runs on the same open eMÖTEN CMS. Mix L2, DCFC, and battery-buffered clusters on a single dashboard, no per-charger licenses, no per-port fees.

The platform underneath

eMÖTEN CMS, $0/month on MÖTEN chargers, for life.

Our charger management system runs every charger we ship: pricing, payments, RFID/app/scan-to-pay access, real-time dashboards, OCPP 1.6, 2.0 ready backhaul, OTA firmware, and white-label branding. No per-port subscription, no transaction fee, no expiry. Included free with every MÖTEN charger we sell.

See the eMÖTEN CMS
Live ops dashboard Sessions, kWh, revenue, uptime, in real time
OCPP 1.6, 2.0 ready Open protocol, never locked to one network
Pricing & payments RFID, app, scan-to-pay, time-of-use, idle fees
OTA firmware Always current. Zero site visits. Zero downtime.
US Footprint

All 50 states. NEVI-aligned, Buy America compliant.

MÖTEN chargers ship from US fulfillment to every state, with certifications that match every state’s rebate, utility, and procurement requirements, UL, ETL, FCC Part 15, OCPP 1.6, 2.0 ready, NACS, ENERGY STAR, and Buy America & BABA where applicable.

All 50 States West Mountain & Plains Midwest & South Northeast
As featured in & covered by
Milestones

From one charger to all 50 US states.

A focused timeline of how the EVFastCharge platform, and the MÖTEN evfc brand, reached nationwide US scale without venture-backed shortcuts.

  1. 2022

    Founded.

    EVFastCharge Ltd. is incorporated in Delaware with one premise: charging hardware shouldn’t be a tax on infrastructure ownership. The first MÖTEN-branded Level 2 prototypes ship for field testing.

  2. 2023

    eMÖTEN CMS launches.

    Proprietary Charger Management System goes live with OCPP 1.6, 2.0 ready support, dashboard, billing, and OTA, bundled free with every MÖTEN charger sold. The “$0/mo on MÖTEN chargers” promise is set.

  3. 2024

    Canada operations + buffered cluster patent filed.

    EVFastCharge Ltd. (Canada) opens in Mississauga, ON; first Canadian shipments under the evfc.io brand. Patent application filed for the battery-buffered DC clustered architecture using Na-ion + supercapacitor energy storage.

  4. 2025

    Pakistan operations + DCFC line debut.

    EVFastCharge (Pvt) Ltd. opens in Karachi as the first South Asia regional entity (evfc.pk). DC fast charger line launches with 30–360 kW models supporting CCS1, CCS2, NACS and CHAdeMO connectors.

  5. 2026 Now

    Unified evfc.com platform, all 50 US states served.

    The unified evfc.com platform launches as the United States flagship site, consolidating product, sales, and support under a single architecture. Buffered cluster systems start shipping commercially across the US, with NEVI-aligned and Buy America compliant SKUs flagged on every product page. International expansion via partner regional sites (Canada, MX, AE, SA, PK, AU, NZ) continues in pipeline.

Certifications wall

Every charger. Every US standard.

We don’t ship a single SKU into the United States without the certifications US programs require. Below is the full US-applicable stack, click into any product page for the specific certificates that apply to that model.

UL Listed

UL 2594 / UL 2231

USA

ETL Certified

Intertek

US / CA

cUL Listed

CSA C22.2 #280

Canada

CSA

Certified Mark

Canada

FCC Part 15

Class B

USA

NACS

SAE J3400

USA

Buy America

BABA / IIJA

USA

CE Marked

EU Directives

EU / Global

RoHS

2011/65/EU

EU / Global

IEC 61851

EV Conductive

Global

OCPP

1.6, 2.0 ready

Global

ENERGY STAR

Certified L2

USA

UL 9540

Energy Storage

Buffered

IP65 / IP67

Outdoor Rated

Global

NFPA 70

NEC Article 625

USA

CB Scheme

IECEE

Global

ISO 9001

Quality Mgmt

Manufacturing
Patent Pending · Buffered Cluster Architecture
Buy America & BABA compliant
NEVI · CFI · 30C eligible
Frequently asked

About MÖTEN evfc, answered.

The questions we get from procurement teams, electrical contractors, fleet operators, and homeowners, before they place an order.

Who owns MÖTEN evfc, and where is the company headquartered?

MÖTEN, evfc, and eMÖTEN are trademarks of EVFastCharge Ltd., a privately-held Delaware corporation headquartered in Wilmington, Delaware, USA. We ship to all 50 US states from US fulfillment, with sales, engineering, and customer support operating from the United States.

What does “evfc” stand for, and how is the brand pronounced?

evfc stands for EV Fast Charge, the descriptive line under the MÖTEN hardware brand. Together they read “MÖTEN EV Fast Charge,” commonly shortened to MÖTEN evfc. The MÖTEN wordmark is always written with capital M, Ö, T, E, N; the evfc mark is always lowercase. eMÖTEN (lowercase e + capital MÖTEN) is the name of our charger management software platform.

Is MÖTEN evfc a manufacturer, a distributor, or a software company?

All three. EVFastCharge Ltd. designs the MÖTEN hardware lineup, Level 2, DC fast, and battery-buffered, and contracts manufacturing through ISO 9001 facilities, then distributes through US warehouses serving all 50 states. We also build and operate the eMÖTEN CMS platform in-house, which is included free for life on every MÖTEN charger we ship. We are not a reseller of someone else’s hardware.

How can the eMÖTEN CMS be free for life when competitors charge $15–$30 per port per month?

Two reasons. First, the eMÖTEN CMS is software we built ourselves, we don’t pay a license fee to a third party, so the only ongoing cost is hosting, which is a small per-charger fraction of a cent per session. Second, we treat the CMS as part of the hardware purchase, not a recurring revenue stream. The free-for-life promise applies on MÖTEN chargers, if you bring third-party hardware onto our platform via OCPP, that connection is offered separately. We’d rather sell you the next charger than charge you rent on the one you already own.

What is the patent-pending battery-buffered cluster, and why does it matter?

It’s our patent-pending DC clustered architecture that lets a single building support 8–20 EV charging ports without a transformer or service upgrade. The system stores energy on-site, we use sodium-ion (Na-ion) and supercapacitor chemistries instead of lithium to eliminate thermal-runaway risk, and dispatches it on demand to any combination of Level 2 and DC fast ports inside a single UL 9540-certified boundary. For high-rises, condos, retail, and any site where utility upgrades cost $50K–$200K and take 6–18 months, this is what makes EV charging financially viable today.

Where do MÖTEN chargers ship from, and how long does delivery take?

Stocked Level 2 SKUs ship within 48 hours from US fulfillment, with delivery to all 50 states. DC fast chargers and battery-buffered cluster systems are built-to-order with typical lead times of 4–8 weeks. Buy America compliant SKUs are flagged on every product page for NEVI, CFI, and Section 30C eligibility. Contact sales for exact in-stock availability, freight quotes, and lead times for your project.

Are MÖTEN chargers OCPP compliant, can I use them on a third-party network?

Yes, on every model we sell. MÖTEN hardware ships fully OCPP 1.6 compliant, 2.0 ready, which means you can connect it to any OCPP-compatible network, ChargePoint, Driivz, Greenlots, AmpUp, EV Connect, GreenFlux, EVConnect, AddEnergie and others. You’re never locked into our eMÖTEN CMS. We just believe ours is better, and it’s included free with every MÖTEN charger, so you can compare without commitment.

How do I get a quote, and who do I talk to for press, partnerships, or installer enrollment?

For sales and quotes, request one at evfc.com/contact or call +1 (888) 528-7582. For press inquiries, email press@evfc.com. For partnership and distribution opportunities, email partners@evfc.com. To enroll as a certified installer, see our Become an Installer page. Sales response time is one business day Monday through Friday.

Ready when you are

Three ways to start the conversation.

Whether you need a single home charger, a 200-port fleet depot, or a battery-buffered cluster on a building you can’t upgrade, we have a US team ready to support your project, in any state.

Response in 1 business day All 50 states served $0/mo CMS on MÖTEN chargers Patent Pending technology
EVFastCharge Ltd. · Wilmington, Delaware, USA
MÖTEN™, evfc™, and eMÖTEN™ are trademarks of EVFastCharge Ltd.
© 2026 EVFastCharge Ltd.