Per kWh, per hour, per session or an idle fee: what each one bills, where state weights and measures law allows kWh pricing, how to cover energy and demand charges, and when complimentary charging makes more sense.
Knowing how to price EV charging comes down to three questions: what the law lets you bill for, what each session really costs you, and what you want drivers to do once their car is full. Answer those three and the price nearly sets itself.
This guide is for commercial site hosts and charge point operators in the United States. It covers pricing models, where per-kWh billing is allowed, energy and demand costs, idle fees and complimentary charging. It is general information, not legal or tax advice.
Almost every public charging price is built from four parts, used alone or combined:
| Model | What it bills | Where it fits |
|---|---|---|
| Per kWh | Energy delivered to the vehicle | Most public sites, fast or slow |
| Per hour or minute | Time connected or time charging | Parking-style charges, or where energy billing is not permitted |
| Per session | A flat amount to start a session | Covering fixed payment and network costs |
| Idle fee | Time a car stays plugged in after charging ends | Busy stalls where turnover matters |
Per kWh is usually the fairest model for drivers, because two cars that take the same energy pay the same, whatever their charging speed. Time pricing charges a car that accepts power slowly more for the same energy, and drivers notice. A 2023 NIST review of the market describes time-based billing as a highly inconsistent indication of the quantity of energy delivered.
In the US, how you may sell electricity at a charger is set mainly by state weights and measures law. Most states build on two handbooks published by the National Institute of Standards and Technology (NIST):
Adoption and enforcement vary by state. The same NIST review found that 45 states had excluded public EV charging sites from the definition of a public utility. Two examples show the range:
Electricity itself cannot be sold by elapsed time under the NIST framework, but NIST guidance allows an additional fee for occupying the space needed to connect, for overstaying after a full charge, or for other services tied to fueling, as long as the fee is properly disclosed. California requires time-based fees to be shown separately from the electricity and itemized on the receipt, and New York requires them to be posted before the customer buys.
In Canada, electricity measurement is federal, under Measurement Canada and the Electricity and Gas Inspection Act. Time-based and flat-fee billing are allowed if the method is transparent and clearly shown to the driver at the time of the charge, and energy-based billing runs under temporary dispensations that remain in effect until December 31, 2029. Operators billing by energy must register as contractors under the Act.
Build the price up from the bill you will actually pay. Four lines matter:
Demand charges are why lightly used fast chargers are expensive to run. An NREL analysis of more than 7,500 commercial and industrial electricity rates found the electricity cost of DC fast charging ranged from under $0.10 to over $2 per kWh depending on station design and use, and that cost falls quickly as utilization rises. Ask your utility about time-of-use rates, and check the rebates page for state and utility programs.
Two levers limit the exposure. eMÖTEN Power, the dynamic load management layer in eMÖTEN CMS, gives each circuit an amp budget, split in real time among the chargers actually drawing current and reassessed every 60 seconds, so the charging load has a known ceiling you can plan around instead of every port drawing at once. On DC sites with a thin service, the XEYAR battery-buffered architecture asks the grid for steady average power and uses an on-site battery to cover the peaks; the detail is on the Battery Buffered page.
Suppose a Level 2 site pays 15 cents per kWh for energy, sees an average session of 20 kWh, and wants 3 cents per kWh for maintenance and network costs plus 5 cents for margin. The energy price is then 23 cents per kWh, or $4.60 for the average session, before card processing. For a public reference point, the Massachusetts Electric Vehicle Infrastructure Coordinating Council's public Level 2 guide gave an example range of $0.30 to $0.40 per kWh for 2024, built from local residential rates plus a modest increase, and warns that prices set too low can draw local drivers who would otherwise charge at home. The economics page covers the hardware side.
Once a battery is full, a parked car blocks the next paying driver. An idle fee prices that. The same Massachusetts guide suggests:
Idle fees matter most where stalls are scarce, such as DC fast sites and busy retail lots; where cars are meant to stay overnight, they mostly irritate. Disclose the fee before the session starts and keep it on its own line on the receipt. In the eMÖTEN pricing engine an idle fee carries a grace period once a battery is full, and a timer model can switch to a per-minute rate after a set period.
Not every charger needs to make money. The AFDC reports that more than 20% of public charging is offered to drivers at no cost.
Complimentary charging can also be simpler on the weights and measures side. California's code, for example, exempts equipment used solely to dispense energy where the amount dispensed does not affect customer charges. It still costs you energy and demand, though, so decide who it is for:
The eMÖTEN CMS pricing engine prices by energy, time, session or any combination, and can vary prices by power band, site, charger, connector, postcode, driver or network. Drivers see the price before charging starts, get a receipt every time, and can pay by app, QR code, payment terminal, RFID or charging credit. The platform is a $0 CMS subscription on MÖTEN chargers and is available for the OCPP chargers you already own; plans and fees are on the eMÖTEN CMS page.
A price is only as good as the money that reaches you. eMÖTEN Pay carries every paid session from the connector to the site owner's account:
The full sequence, from holds and refunds to self-billed statements, is in our guide to automated settlement for EV charging.
In most states, yes, but the rules come from state weights and measures law. Many states follow NIST Handbook 130, which names the kilowatt-hour as the unit of sale, and NIST Handbook 44 Section 3.40, which sets the device requirements. Confirm with your state weights and measures office before you post a price.
Under the NIST framework, a fee for overstaying after a full charge or for occupying the charging space is allowed as a separate charge for a service, as long as it is properly disclosed. Post it before the session starts and show it separately from the energy charge.
With eMÖTEN Pay, each paid session is matched to its settled card payment. When the month closes, each site owner receives a line-by-line statement and is paid from Stripe into their own Stripe Connect account.
Send your tariff, charger count and how drivers use the site. Within two business days we will suggest a pricing structure and show how eMÖTEN Pay would settle it.