Buffered DC Fast Cluster

Battery buffered DC fast charging.
Up to 720 kW per cluster from a 100 A service.

Battery buffered DC fast charging clusters: five DC fast charger families (PEGASUS, FALCÃO, SPHINX, KOMODO, MAVERICK) clustered around a DRACO ESS hub on the XEYAR shared DC bus. 30 kW to 720 kW per cluster, 2 to 4 dispensers per cluster (custom with MAVERICK), typically with no transformer upgrade. Free shipping and eMÖTEN CMS included on MÖTEN chargers. VPP-ready hardware.

720kW
Per Cluster Max
2–4dispensers
Per Cluster
100A 3-phase
Existing Grid Service
Charger families available

DC fast charger families for buffered clusters. One shared DC bus.

Each family targets a specific deployment scenario, from entry-tier workplace DC fast charging to 720 kW highway hubs. All clustered on the XEYAR shared DC bus. Download the family spec sheet or request a configured quote.

PEGASUS

Entry
30 / 40 kW · Workplace · Small commercial

Entry DCFC family. 30 kW or 40 kW per dispenser, 1 to 8 ports per cluster. Right-sized for workplaces, fleet starter deployments, and small-commercial sites that want DC speed without FALCÃO-tier capex.

Power / dispenser
30 or 40 kW
Ports / cluster
2 or 4
Connectors
CCS1, built-in NACS cable
Use case
Workplace · small comm.

FALCÃO

Workhorse
120–360 kW · Highway · Liquid-cooled

Workhorse DCFC family. 120, 180, 240, or 360 kW per dispenser. Built for highway corridor deployments. Liquid-cooled cables at 240 kW and above. The default choice for most commercial DCFC sites.

Power / dispenser
120–360 kW
Ports / cluster
2
Connectors
CCS1, built-in NACS cable
Use case
Corridor · fleet

SPHINX

Ultra-fast
240 / 360 kW · Urban form-factor · Premium

Ultra-fast urban DCFC. 240 kW or 360 kW per dispenser with a focus on urban form-factor, smaller footprint than FALCÃO with comparable output. Liquid-cooled cables. Premium materials and a 32-inch advertising display.

Power / dispenser
240 or 360 kW
Ports / cluster
2
Connectors
CCS1, built-in NACS cable
Use case
Urban · premium retail

KOMODO

Hub
240–720 kW · 4-dispenser HPC hub

High-power HPC hub. One DRACO ESS cabinet feeds four dispensers for 240, 360, 480, or 720 kW total cluster output. Highway hubs, fleet depots, HD truck charging. Designed to run on a 100 A service, depending on the site.

Cluster total
240 / 360 / 480 / 720 kW
Dispensers
4 per cluster
Connectors
CCS1, built-in NACS cable
Use case
Highway · depot

MAVERICK

Custom
Custom engineered · 30 kW to 1 MW+ · Per-project specs

If your site requires a power tier, port count, enclosure form-factor, or grid configuration that the standard families don't cover, MAVERICK is the path. The XEYAR shared DC bus architecture scales from 30 kW to 1 MW+ with the same fundamental design, only the dispensers and battery sizing change. Engineering NRE quoted per project.

Configure your DC cluster

Battery buffered DC fast clusters. One quote away.

Browse all DC cluster SKU configurations on the main Battery Buffered page, or download the DC Cluster Overview PDF for the full architecture story plus technical specifications.

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers ETL certified (UL 2202 DC, UL 2594 Level 2).

Frequently Asked

Battery buffered DC fast charging. Common questions.

Service capacity, power, peak demand, connectors, warranty and lead time for buffered DC fast clusters.

Can I install DC fast charging without a transformer upgrade?

In most cases, yes. A battery buffered DC fast cluster is designed to run on a 100 A, 3-phase 480 V service (83.1 kW continuous). The DRACO ESS stores energy between sessions and covers the peaks, so the grid never has to supply the full charger power. A site assessment confirms your service and utility tariff.

How much power can a battery buffered DC fast cluster deliver?

From 30 kW to 720 kW per cluster, with 2 to 4 dispensers per cluster (custom with MAVERICK). A KOMODO hub feeds four dispensers from one cabinet, up to 720 kW total. Chargers deliver full power while the buffer has charge, and the grid recharges it between sessions.

What happens when many cars charge at once?

The battery is sized to the site’s port count and use profile, so it covers the expected peaks. eMÖTEN Power, the dynamic load management layer in eMÖTEN CMS, is designed to hold at least 50% of nameplate power on every active port. For high-turnover sites, see our guide to gas station DC fast charging.

Which connectors do battery buffered DC fast chargers include?

Every DC fast dispenser has CCS1 and a built-in NACS cable. Standalone units are on our DC fast chargers page.

What warranty and certifications cover a DC fast cluster?

The charger hardware carries a 2-year manufacturer warranty and the battery carries a 10-year warranty from the manufacturer. Charger warranty extends to 5 years (2 + 3) or 10 years (2 + 8) in total, and charger hardware is backed by a 97% uptime SLA.

XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers ETL certified (UL 2202 DC, UL 2594 Level 2).

How long does a buffered DC fast cluster take to deliver?

Lead time is 60 to 90 days from order, depending on configuration; KOMODO 720 hubs with a cabinet and dispensers take longer. Fleet operators can size the cluster with our guide to fleet depot charging.