Within 24 hours. No obligation.

Get an EV charging station quote. Real numbers.

Your EV charging station quote itemizes hardware, install scope, the rebates you may qualify for, and lead time, returned by our engineering team within 24 hours. No site visit required to start. No obligation to buy.

Free quote · no obligation ETL certified hardware eMÖTEN CMS included on every MÖTEN charger Wilmington, Delaware · ships in 48 hours

What you get back

Four numbers.
Not a sales pitch.

Every quote is built by our engineering team and includes the four numbers below: itemized, defensible, and with the state and utility rebates that may apply at your site.

Itemized hardware

Every charger, every pedestal, every cable. Line-by-line pricing at MAP, with no bundled padding. eMÖTEN CMS included on every MÖTEN charger.

Install scope range

Conservative low and high estimates for trenching, conduit, panel, and labor. Site-specific, based on the panel size and parking layout you share.

Rebate check

State, utility and local programs that may apply at your address, listed with links. Confirm eligibility with the program before you rely on it.

Lead time

Days from order confirmation to commissioning. Honest about panel-upgrade dependencies and permit windows. In-stock Level 2 ships in 48 hours; DC fast and battery-buffered clusters take 60 to 90 days.

Start your quote

Tell us about your project.

Pick the type that fits, fill in the rest, and an engineer gets back to you within 24 hours. Every field except project type, address, name, email and consent is optional, so share what you know.

1 · Project type
2 · Site & project

Used to size the install and check state and utility rebates for your site.

3 · About you
Within 24 hours. No obligation.

How it works

From submit to itemized quote, within 24 hours.

No funnel into a sales sequence. No phone-tree handoff. The form goes to an engineer, the engineer builds the quote, and the itemized PDF comes back to your inbox.

  1. Right now: 3 minutes

    You send the form

    Pick a project type, give us a site address, tell us how many chargers. Optional fields help refine the estimate. Nothing here is binding.

  2. Within 24 hours

    An engineer builds it

    Our engineering team checks the state and utility rebates for your address, sizes the hardware against your panel, and ranges the install scope. No sales script.

  3. In your inbox

    Itemized PDF back

    You get the four numbers (hardware, install, rebates, lead time) in a single PDF. If you have questions, you reply. If you’re ready to move, we connect you with an installer or ship hardware direct.

Common Questions

About the quote.

How long does an EV charging station quote take to come back?

Quotes are prepared by our engineers and returned within 24 hours. That applies to Level 2 home, commercial, DC fast and battery-buffered cluster projects. If a project needs a site question answered first, we reach out within the same 24 hours.

Does requesting a quote cost anything?

No. You get a free quote with no obligation to buy. It includes itemized hardware pricing, an installation scope estimate, a check of state and utility rebates that may apply, and the lead time. You decide whether to move forward.

Do you need a site visit before quoting?

No. The quote uses the information you provide (site address, panel size, charger count and parking layout) to produce an itemized estimate. A site visit is scheduled only after you accept the quote and an installer is assigned.

What does the quote include?

Every quote includes itemized MÖTEN hardware pricing, the eMÖTEN charger management system (included free on every MÖTEN charger), an installation scope and budget range, references to state and utility rebates that may apply, and the lead time from order to commissioning.

How long does delivery take after I order?

In-stock Level 2 chargers ship within 48 hours. DC fast chargers and battery-buffered cluster systems are built to order, typically 60 to 90 days. Your quote shows the lead time for your exact configuration, plus any permit or panel-upgrade steps that affect the schedule.

Which rebates does the quote check?

The quote lists the state, utility and local incentive programs that may apply at your site address. Program rules and funding change often, so confirm eligibility with the program, and with your tax advisor for any tax treatment, before you rely on it. See our EV charger rebates by state page for an overview.

What if I am still researching and not ready for a quote?

Browse the product pages for full specs and published pricing. The Home Chargers, Commercial Level 2, DC Fast and Battery Buffered pages each include decision helpers and FAQs. When you are ready to compare specific configurations, come back here for an itemized quote.

24-hour turnaround · Free quote · No obligation

Real numbers, in your inbox
by tomorrow.

Three minutes to fill the form. 24 hours for the quote. Then it’s your call.

or call us
Every day, 7 a.m. to midnight ET