Patent Pending · USPTO + CIPO
About MÖTEN evfc

MÖTEN evfc. Built to last.
Built for Canada.

We’re EVFastCharge Ltd., the federally incorporated Canadian company behind MÖTEN evfc: certified Level 2 chargers, DC fast chargers, patent-pending battery-buffered clusters, and the eMÖTEN CMS. Sold and supported from Ontario, shipped free anywhere in Canada, priced in CAD, and built on one principle: you own your infrastructure, not your vendor.

13regions
Free shipping to every province and territory
$0/mo
CMS fee on MÖTEN chargers, for life
3–7days
Level 2 ships in 3 to 7 business days
2yr
Manufacturer warranty, in addition to your statutory rights
Why we built this

The EV charging industry was set up to charge you twice.

Once for the hardware. Then forever for the software, the network, and the right to use what you already own.

Every EV charger needs a Charger Management System (CMS) to do anything useful, pricing, payments, access control, reporting, OCPP integration. Most vendors bundle the hardware at a competitive price, then bill you a fee per port, every month, forever, for the software. They take a cut of every transaction. They lock the firmware. And the moment you try to leave, your hardware turns into a paperweight.

We started MÖTEN evfc on a different premise: infrastructure should belong to the people who pay for it. So we made eMÖTEN CMS part of every MÖTEN charger: the software cost is built into the hardware price. No monthly fee on MÖTEN chargers. No percentage of your energy revenue. No proprietary lock-in. We compete on the hardware, the software, and the support, not on hostage-taking.

That decision shaped everything else. It’s why we engineer for OCPP open standards. It’s why we publish honest CAD pricing across Canada with cETLus certification (UL and CSA standards) flagged on every SKU. It’s why our patent-pending battery-buffered clusters let small electrical services support 8–20 charging ports without a utility upgrade. And it’s why our customers stay, not because they’re trapped, but because they don’t want to leave.

If you have to lock your customers in to keep them, you don’t have customers. You have hostages.

· The MÖTEN evfc operating principle

What we set out to fix

Five things the industry got wrong.

  • Mandatory monthly CMS fees. A fee per port, every month, forever, on hardware you already paid for.
  • Proprietary firmware lock-in. Switch vendors and your chargers stop working. Closed protocols by design.
  • Transaction take-rates. A share of every kWh sold goes to the network, not the site host.
  • Grid-upgrade gatekeeping. “You need 800A service” pushes deployments past financial viability.
  • Unprovable warranty claims. Warranties with conditions that void the moment you file.
MÖTEN evfc exists because none of these had to be true.
What we stand for

Mission, vision, and the three principles we won’t bend on.

Most company values pages are decoration. Ours actually decide product calls. If a feature breaks one of these, it doesn’t ship.

Our Mission

Make charging infrastructure that’s actually profitable, not just possible.

We exist to put the economics of EV charging back in the hands of site owners, fleet operators, property managers, and homeowners. That means certified hardware at honest prices, software included for life on every MÖTEN charger, and infrastructure that earns, not bleeds.

Our Vision

A world where charging an EV is as simple, open, and ownable as plugging in a fridge.

No subscription on MÖTEN chargers. No proprietary plug. No vendor permission slip. Just standard hardware, open protocols (OCPP 1.6, 2.0.1 ready), and software that respects the people who paid for it. That’s the future we’re building toward, one site at a time, across Canada and counting.

The three principles

If a feature breaks one of these, it doesn’t ship.

PRINCIPLE 01

Honesty in numbers.

Every spec we publish is third-party verifiable. Every “free” claim names what it’s free on, such as MÖTEN chargers. Every price is in your local currency. We don’t round up uptime, round down warranty fine print, or use weasel words.

PRINCIPLE 02

Open by default.

Open Charge Point Protocol on every charger, every firmware. Your chargers stay on standard OCPP, and your data can be exported in full. If you ever want to leave us, take your hardware with you: it works on any OCPP-compliant network.

PRINCIPLE 03

You own what you buy.

Once you take delivery, the hardware is yours. The data is yours. The revenue is yours. We don’t hold firmware hostage, take a cut of your kWh sales, or charge for software access on MÖTEN chargers. Buying from us means owning, not renting forever.

What we build

Four product lines. One platform.

Every charger we ship runs on the same open eMÖTEN CMS. Mix L2, DCFC, and battery-buffered clusters on a single dashboard, no per-charger licences and no per-port fees on MÖTEN chargers.

The platform underneath

eMÖTEN CMS, $0/month on MÖTEN chargers, for life.

Our charger management system runs every charger we ship: pricing, payments, RFID/app/scan-to-pay access, real-time dashboards, OCPP 1.6, 2.0.1 ready backhaul, OTA firmware and software load management. No per-port subscription on MÖTEN chargers, no percentage of your energy revenue, no expiry. Included free with every MÖTEN charger we sell.

See the eMÖTEN CMS
Live ops dashboard Sessions, kWh, revenue, uptime, in real time
OCPP 1.6, 2.0.1 ready Open protocol, never locked to one network
Pricing & payments RFID, app, scan-to-pay, time-of-use, idle fees
OTA firmware Always current, with no site visit needed.
Milestones

From one charger to coast to coast.

A focused timeline of how the EVFastCharge platform, and the MÖTEN evfc brand, grew across North America without venture-backed shortcuts.

  1. 2022

    Founded.

    EVFastCharge is founded with one premise: charging hardware shouldn’t be a tax on infrastructure ownership. The first MÖTEN-branded Level 2 prototypes ship for field testing.

  2. 2023

    eMÖTEN CMS launches.

    eMÖTEN Charger Management System goes live with OCPP 1.6 support, dashboard, billing and OTA updates, included free on every MÖTEN charger sold. The “$0/mo on MÖTEN chargers” promise is set.

  3. 2024

    Canada operations + buffered cluster patent filed.

    Canadian operations open in the Greater Toronto Area. Patent application filed for the battery-buffered DC clustered architecture using Na-ion + supercapacitor energy storage.

  4. 2025

    DC fast charger line debuts.

    DC fast charger line launches with 30–360 kW models, with CCS1 and NACS connectors for North America.

  5. 2026 Now

    evfc.com/ca-en/: the Canadian site.

    The Canadian site launches on evfc.com/ca-en/, sold by EVFastCharge Ltd. with prices in CAD, free shipping anywhere in Canada and cETLus certifications listed on every product page. eMÖTEN Power software load management goes live on Level 2 sites.

Certifications

Certified hardware. Open standards.

Every MÖTEN charger sold in Canada is cETLus certified. Below are the marks and standards that apply across the range; each product page lists the certificates for that model, and certificates are available on request.

cETLus Certified

UL 2594 and CSA C22.2 No. 280 (Level 2), UL 2202 (DC)

Canada

XEYAR battery storage

UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA

Storage

ENERGY STAR on select models

DORADO, LYNX, PHOENIX

Select models

IEC 61851

EV conductive charging

Standard

IP65 / IP67

Outdoor rated, by model

Enclosure

NACS

SAE J3400 connector

Connector

OCPP

1.6 supported, 2.0.1 ready

Protocol
Patent Pending · USPTO + CIPO
cETLus certified hardware
Rebate guidance by province
Frequently asked

About MÖTEN evfc, answered.

The questions we get from procurement teams, electrical contractors, fleet operators, and homeowners, before they place an order.

Who sells MÖTEN evfc in Canada, and where is the company based?

On the Canadian site you buy from EVFastCharge Ltd., a federally incorporated company based in Ontario (GST/HST [GST/HST NUMBER]). MÖTEN, evfc and eMÖTEN are trademarks of EVFastCharge Ltd., founded in 2022. We ship free anywhere in Canada, and our sales and support team is available every day, 7 a.m. to midnight Eastern.

What does “evfc” stand for?

evfc stands for EV Fast Charge, the descriptive line under the MÖTEN hardware brand. Together they read “MÖTEN EV Fast Charge,” usually shortened to MÖTEN evfc. The MÖTEN wordmark is always written in capitals with the Ö; evfc is always lowercase. eMÖTEN (lowercase e, then MÖTEN) is the name of our charger management software.

Is MÖTEN evfc a manufacturer, a distributor, or a software company?

All three. We design the MÖTEN hardware lineup (Level 2, DC fast and battery-buffered), which is built by our manufacturing partners and sold across Canada. eMÖTEN CMS runs every MÖTEN charger, and its settlement and eMÖTEN Power load management layers are built and owned by us. We are not a reseller of someone else’s hardware.

How can the eMÖTEN CMS be free for life on MÖTEN chargers?

Because the software cost is built into the price of MÖTEN hardware. We treat the CMS as part of the charger, not a monthly bill, so there is a $0 CMS subscription and no platform fee on MÖTEN chargers. If your drivers pay to charge, each paying session carries a per-session fee, and card processing is passed through at cost. If you want to connect other OCPP chargers, see the plans on our EV charging management software page.

What is the patent-pending battery-buffered cluster, and why does it matter?

It is our patent-pending (USPTO and CIPO) DC cluster architecture that lets one building support 8 to 20 EV charging ports without a transformer or service upgrade. The system stores energy on site in sodium-ion (Na-ion) and supercapacitor storage, rated from -40 to +65 °C, and sends it on demand to Level 2 and DC fast ports. For condos, strata buildings, retail and other sites where a utility upgrade is expensive and slow, this is what makes EV charging viable now.

How long does delivery take in Canada?

Level 2 chargers, home chargers, pedestals and accessories ship in 3 to 7 business days, with free shipping anywhere in Canada and no duties or customs fees at delivery. DC fast chargers and battery-buffered cluster systems are built to order and ship in 60 to 90 days. Level 2 chargers are cETLus certified to UL 2594 and CSA C22.2 No. 280, and DC fast chargers to UL 2202, as shown on each product page.

Are MÖTEN chargers OCPP compliant, and can I use them on another network?

Yes, every model we sell. MÖTEN hardware is OCPP 1.6, 2.0.1 ready, so you can connect it to any OCPP-compatible charging network. You are never locked into eMÖTEN CMS: it is included free on every MÖTEN charger, so you can compare without commitment.

How do I get a quote, and who do I talk to for partnerships, press, or installer enrollment?

For sales and quotes, request a quote or call +1 (888) 528-7582. For partnerships, distribution and press, email partners@evfc.com. Licensed Canadian electricians can join our installer network on the Installer Connect page. We usually reply within 24 hours.

Ready when you are

Three ways to start the conversation.

Whether you need a single home charger, a 200-port fleet depot, or a battery-buffered cluster on a building you can’t upgrade, our team supports your project in every province and territory.

Response within 24 hours Free shipping anywhere in Canada $0/mo CMS on MÖTEN chargers Patent Pending technology
EVFastCharge Ltd. · Toronto, Ontario, Canada, Ontario, Canada
MÖTEN™, evfc™, and eMÖTEN™ are trademarks of EVFastCharge Ltd.
© 2026 EVFastCharge Ltd.