Battery buffered EV chargers built on the patent-pending XEYAR shared DC-bus architecture. Add high-power EV charging to your existing supply, typically with no transformer upgrade and no long DISCO wait (your site survey confirms it). VPP-ready hardware ships today; grid-service programs are planned for 2027.
The patent-pending XEYAR design uses a shared DC bus where grid input and battery discharge are simultaneous and additive, not sequential. That single architectural choice is why a modest supply can drive up to 720 kW of EV charging per cluster, typically without a transformer upgrade.
A standard three-phase supply feeds the bidirectional PCS, which converts AC to DC for the shared bus. Sized to your sanctioned load (400 V three-phase), flat, continuous, never spiked.
Same PCS regardless of battery chemistry.
DRACO sits on the DC bus and absorbs / releases on demand. Three storage tiers: Na-ion 5C (symmetric, 20K cycles, cost-optimized), SuperCap 3C (symmetric, 500K+ cycles, ultra-long life), and a 1C/2C outdoor cabinet for clusters above 150 kWh. Selected per installation.
Why 5C? Above 5C, the grid input limits the charge side, so higher C-rates buy nothing. 5C is the engineered ceiling.
Charger power = grid + battery simultaneously. eMÖTEN CMS is designed to hold at least 50% of nameplate per active port, with eMÖTEN Power, the dynamic load management layer in eMÖTEN CMS. The battery itself is run by its own battery management system (BMS).
OCPP 1.6, 2.0.1 ready.
The shared DC-bus architecture, energy management algorithms, multi-port distribution logic, and battery sizing methodology are covered by the XEYAR patent application (Patent Pending, USPTO + CIPO). Engineered with our sister company XEYAR Ltd. under common ownership. Inventor: Sal Möten · XEYAR Ltd.
Designed to run on your existing supply, so most sites skip the major DISCO upgrade and the long construction queue. Your site survey confirms it.
Bidirectional PCS and DRACO ESS are designed for grid export. Grid-service programs are planned for 2027, with no hardware swap required.
eMÖTEN Power is designed to hold at least half of nameplate power on every active port.
DRACO supports Na-ion 5C (cost-optimized), SuperCap 3C (ultra-long life), and a 1C/2C outdoor cabinet for large-capacity sites.
Full-power L2 or DC Fast on a service that traditionally couldn’t support it. KOMODO 720 hub configuration.
XEYAR battery storage is UL 9540A tested. Na-ion and SuperCap storage carry far lower thermal-runaway risk than lithium-ion, which simplifies siting in basements and residential towers.
The XEYAR storage is rated from mountain winters to desert summers, with no HVAC required. Built for Pakistan's heat.
Delivery and installation by MÖTEN Install, quoted with your system.
Buffered Level 2 for apartment towers, offices and fleet depots. Buffered DC Fast for fuel stations, motorways and fleet hubs. Both built on the XEYAR shared DC bus.
11 kW LYNX and PHOENIX chargers clustered with a DRACO ESS hub on a shared DC bus. 8 to 20 ports per cluster, all running off a standard three-phase supply.
LYNX11-B50N-12C = LYNX 11 kW · 50 kWh Na-ion · 12-port cluster
Full-power DC fast charging, 30 kW to 720 kW per cluster, on a standard three-phase supply. PEGASUS, FALCÃO, SPHINX, KOMODO and MAVERICK families, all clustered on the XEYAR shared DC bus.
SPH240-B150N-2C = SPHINX 240 kW · 150 kWh Na-ion · 2-port cluster
Filter by family type. Battery sizes shown are our defaults per port count; every cluster is custom-sized to your site’s load profile, port count and operating environment. All clusters are quoted per site.
Indicative starting prices in Pakistan: Level 2 clusters from PKR 8,736,000, DC clusters from PKR 15,876,000, XEYAR 240 from PKR 33,628,000. Request a quote.
12 featured configurations shown. Need a different power tier or port count? Talk to engineering →
Every battery buffered EV charger cluster ships with a bidirectional power conversion system and DRACO ESS designed for grid export. Grid-service (virtual power plant) programs are not available yet. They are planned for 2027, and the hardware you install today will not need a swap to join them.
The battery covers charging peaks, so high-power charging runs on the service you already have, typically with no transformer upgrade.
Bidirectional power conversion and battery storage designed for grid export, with eMÖTEN Power managing the chargers and the battery run by its own BMS.
When programs launch, eligibility and any payments will depend on your DISCO, the program rules and how the battery is used.
We do not quote VPP revenue today. Your quote covers charging hardware, storage, installation and eMÖTEN plans, sized for your site.
Get a battery-buffered quoteFour representative site profiles where battery-buffered clusters can beat conventional charging on cost, time and feasibility. Your actual site is sized by our engineering team, request a site assessment →
Reference 12-port LYNX 11 kW office deployment. What each path requires, in time, infrastructure and recurring cost.
| Metric | Conventional Non-Buffered | XEYAR LYNX11-B50N-12C Winner |
|---|---|---|
| Required Service | About 132 kW upgrade | Existing existing |
| DISCO Upgrade | Required · transformer build | Typically none |
| Time to Install | Several months (DISCO queue) | 60–90 days lead time |
| Basement / Tower Siting | Lithium storage rules & suppression | Lower thermal-runaway risk |
| Operating Range | Varies by chemistry | −40 °C to +65 °C |
| Delivery | Charged separately | Quoted with the system |
| Grid services (VPP) | Not possible | VPP-ready · programs planned 2027 |
| Software | Vendor subscription per port | eMÖTEN plans per port |
| Architecture Verdict | DISCO-dependent · high recurring cost | Grid-light · VPP-ready · lower OPEX |
XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A and IEC 62619. MÖTEN DC fast chargers TÜV Rheinland certified to IEC 61851.
Battery buffered EV charger architecture, inspection, VPP roadmap, warranty, freight and deployment time: the answers engineers and procurement managers ask first.
A battery buffered EV charger has on-site energy storage between the grid and the chargers. It stores energy from a modest supply and releases it when EVs charge, so you get high charging power on a small grid connection. A regular 240 kW DC fast charger needs a 240 kW supply; a buffered SPHINX 240 cluster delivers 240 kW per port while the buffer has charge, and the grid recharges it between sessions.
In most cases, no. Buffered clusters are designed to run on your existing three-phase supply; the DRACO ESS covers the difference between grid input and charger demand. That typically avoids a major transformer upgrade and the long wait for your DISCO. A site survey confirms your sanctioned load and tariff.
Both sit on the same shared DC bus. Sodium-ion (5C, about 20,000 cycles) is the cost-optimised choice for most sites. Supercapacitor (3C, 500,000+ cycles) suits sites with many short, high-power sessions. Clusters above 150 kWh use a 1C/2C outdoor cabinet. Our engineers select the chemistry for each site.
XEYAR battery storage is UL 9540A tested, and sodium-ion and supercapacitor storage carry far lower thermal-runaway risk than lithium-ion. Local fire and building rules still apply site by site, and we provide the documents your engineer and building management need.
Every cluster is quoted per site. Indicative starting prices: Level 2 clusters from PKR 8,736,000, DC fast clusters from PKR 15,876,000, and XEYAR 240 from PKR 33,628,000. Request a quote for your site.
Battery buffered clusters are built to order; lead time is typically 60 to 90 days from order, depending on configuration. The big saving is not waiting for a bigger DISCO connection.
The charger hardware carries a 2-year manufacturer warranty, extendable to 5 years, and the battery carries a 10-year warranty from the manufacturer. The eMÖTEN platform carries a 97% uptime SLA.
The hardware is VPP-ready: the bidirectional power conversion system and DRACO ESS are built for grid export. Grid-service programs are planned for 2027 and are not available yet, so today the system works as a buffered charger. We do not quote VPP revenue.