Battery buffered Level 2 charging puts every Level 2 charger on battery storage: four charger families (BOÖTES, LYNX, DRACO, PHOENIX) clustered around a DRACO ESS hub on the XEYAR shared DC bus. 8 to 20 ports per cluster, all running off existing 100 A service, typically with no transformer upgrade, for condo and strata garages, workplaces and depots. Storage rated −40 °C to +65 °C. Free shipping anywhere in Canada and a $0 eMÖTEN CMS subscription on MÖTEN chargers.
Each family is purpose-built for a specific use case. All four cluster on the XEYAR shared DC bus with a DRACO ESS hub. Download the family spec sheet or request a configured quote.
Value-tier 48 A Level 2. Single and dual configurations. IP65 and IK08 enclosure for indoor or outdoor use. Best for condo, strata and workplace overnight charging where you control access.
Premium 48 A or 80 A Level 2. Non-monetized. IP65 outdoor, status display. 19.2 kW per port at 80 A.
Monetized 48 A Level 2. Secure card payments by QR code, RFID, mobile app authentication. Site owners recover energy and operating cost without a full DCFC investment.
Premium monetized 48 A or 80 A Level 2. status display, QR code payments with Apple Pay and Google Pay, and per-port load balancing. 19.2 kW at 80 A.
Browse all L2 cluster SKU configurations on the main Battery Buffered page, or download the L2 Cluster Overview PDF for the full architecture story plus technical specifications.
XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).
Service capacity, port counts, charger families, condo and strata use, payments, warranty and lead time for buffered Level 2 clusters in Canada.
In most cases, yes. A battery buffered Level 2 cluster is designed to run 8 to 20 ports on an existing 100 A service (24 kW continuous). The DRACO ESS covers the difference between grid input and charger demand, and eMÖTEN Power, the dynamic load management layer in eMÖTEN CMS, shares power between ports. A site assessment confirms your existing service and panel headroom, and your electrician confirms the design under the Canadian Electrical Code.
Clusters are configured from 8 to 20 ports, at 11.5 kW per port (48 A) or 19.2 kW per port (80 A). The featured configurations are BOÖTES 48 with 8 ports, LYNX 48 with 12, DRACO 48 with 16 and PHOENIX 80 with 20, each with a battery sized to the site’s use profile.
For staff, condo and strata residents, tenants or fleets that do not pay per session, choose BOÖTES (value) or LYNX (premium, 48 A or 80 A). To charge drivers, choose DRACO (card payments by QR code) or PHOENIX (card payments by QR code, 48 A or 80 A). The same families are sold standalone on our Commercial Level 2 page.
Yes. BOÖTES or LYNX with RFID per resident and per-user energy tracking in eMÖTEN CMS fit shared parking, and the cluster keeps the building on its existing service. Sodium-ion and supercapacitor storage carry far lower thermal-runaway risk than lithium-ion, which simplifies siting in parking garages; your provincial inspector approves each installation.
Yes, with DRACO or PHOENIX: drivers pay by card, Apple Pay or Google Pay through a QR code on the charger, or by RFID or the app. eMÖTEN Pay, the automated settlement layer in eMÖTEN CMS, matches every session to the payment behind it and pays the site owner monthly. eMÖTEN supports time, session and kWh pricing; kWh billing in Canada follows Measurement Canada rules.
The charger hardware carries a 2-year manufacturer warranty, in addition to your statutory rights, and the XEYAR battery carries a 10-year warranty. Charger warranty extends to 5 years (2 + 3) or 10 years (2 + 8) in total, sold separately, and charger hardware is backed by a 97% uptime SLA.
XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified (UL 2202 DC, UL 2594 and CSA C22.2 No. 280 Level 2).
Lead time is 60 to 90 days from order, with free shipping anywhere in Canada, and Level 2 clusters are at the shorter end. A conventional multi-port site that needs a service upgrade can wait months for the utility. See the EV charger installation timeline for the permit and inspection steps.