Ontario EV Charging

EV charger rebate Ontario.
The honest answer.

There is no provincial EV charger rebate in Ontario as of November 2026. What Ontario does offer: an Ultra-Low Overnight electricity price of 3.7¢ per kWh from 11 p.m. to 7 a.m., a condo regulation that lets owners apply to install a charger with a 60-day board response, and a clear ESA permit process. Here is how each one works.

$0
Provincial charger rebate
3.7¢
Per kWh, 11 p.m. to 7 a.m.
60 days
Condo board response time
Checked November 2026. Programs change often · confirm with the official program page before you buy · MÖTEN evfc does not run any government rebate
Ultra-Low Overnight

The overnight price is Ontario's real incentive.

Ontario's Ultra-Low Overnight (ULO) price plan charges 3.7¢ per kWh every night from 11 p.m. to 7 a.m., all year. These are the Ontario Energy Board prices set for November 1, 2026.

Source: Ontario Energy Board, prices set for November 1, 2026. Electricity price only: delivery, regulatory charges and HST are added on your bill.
Ultra-Low Overnight periodHoursPrice per kWh
Ultra-low overnightEvery day, 11 p.m. to 7 a.m.3.7¢
Weekend off-peakWeekends and holidays, 7 a.m. to 11 p.m.9.1¢
Mid-peakWeekdays, 7 a.m. to 4 p.m. and 9 p.m. to 11 p.m.14.6¢
On-peakWeekdays, 4 p.m. to 9 p.m.37.7¢

Labelled example. 330 kWh a month from the wall (about 1,500 km at an assumed 20 kWh per 100 km plus 10% charging losses) costs about $12.21 at 3.7¢, $30.03 at the 9.1¢ time-of-use off-peak price, and $124.41 if it all landed in the 37.7¢ ULO on-peak window. Set your car to charge after 11 p.m. The method is in our cost to charge guide. Ask your local utility how to switch plans. Source: OEB electricity rates.

Checked November 2026. Programs change; confirm with the official program page before you buy.

Condos

Condo EV charging: Ontario Regulation 48/01.

Ontario Regulation 48/01 under the Condominium Act sets the process for an owner who wants to install an electric vehicle charging system (EVCS).

  1. Apply in writing

    The owner submits a signed application with drawings, specifications and details of the installation.

  2. 60-day response

    The corporation has 60 days to respond in writing, unless both sides agree to extend.

  3. Limited refusal

    The board can refuse only on a qualified professional's report showing a law violation, a structural risk or a health and safety risk, and must give the owner a copy.

  4. 90-day agreement

    Once accepted, owner and corporation have 90 days to sign a written agreement that says who pays.

  5. Registered on title

    The corporation registers the agreement on the unit's title; it takes effect once registered.

For an owner-initiated installation, the owner generally pays the installation costs unless the agreement says otherwise. Source: Condominium Authority of Ontario. Full walkthrough: condo and strata EV charging guide.

Checked November 2026. Programs change; confirm with the official program page before you buy.

ESA Permits

Every Ontario charger install needs an ESA permit.

The Electrical Safety Authority (ESA) says all EV charger installations require an electrical permit, filed before work starts, by a Licensed Electrical Contractor (LEC).

Before work

Permit (notification) filed

The contractor files the permit before starting. It creates a permanent record and triggers an ESA review. The province also says installation must be done by a licensed electrical contractor under the Ontario Electrical Safety Code.

Checked November 2026 · Official source: ESA EV charging · ontario.ca
After work

Certificate of Acceptance

Once the work is complete, the contractor gives you the ESA Certificate of Acceptance. ESA recommends keeping the permit and certificate for insurance and resale.

Checked November 2026 · Official source: ESA EV charging
Your panel

Check capacity first

ESA says to make sure your panel can handle the extra load, and to contact your local utility if an upgrade is needed. See our installation guide on load calculations and EVEMS.

Checked November 2026 · Official source: ESA EV charging

Checked November 2026. Programs change; confirm with the official program page before you buy.

Public Charging Funding

For businesses and municipalities.

Ontario (OVIN)Not accepting

EV ChargeON

EV ChargeON funds public EV charging stations in Ontario communities, covering 25 to 75% of eligible expenses. The program page says it is currently not accepting applications. OVIN has said a Community Sites Stream is coming, without dates.

Checked November 2026 · Official source: OVIN EV ChargeON
Federal (NRCan)Closed

ZEVIP

All streams of the federal Zero Emission Vehicle Infrastructure Program are closed for applications. See the Canadian incentives hub.

Checked November 2026 · Official source: NRCan ZEVIP

Checked November 2026. Programs change; confirm with the official program page before you buy.

Frequently Asked

Ontario questions.

Does Ontario have an EV charger rebate?
No. As of November 2026 there is no provincial EV charger rebate for Ontario homes or businesses. The provincial EV ChargeON program for public charging is not accepting applications, and the federal ZEVIP program is closed.
What is the ultra-low overnight electricity rate in Ontario?
The Ontario Energy Board set the Ultra-Low Overnight price at 3.7 cents per kWh from 11 p.m. to 7 a.m. every day, for prices effective November 1, 2026. The same plan charges 37.7 cents per kWh on weekdays from 4 p.m. to 9 p.m., so schedule charging overnight.
Can my condo board refuse an EV charger in Ontario?
Only on limited grounds. Under Ontario Regulation 48/01, the board can refuse only if a qualified professional's report shows the installation would break the law, compromise structural integrity or create a health and safety risk, and it must give you a copy of that report.
How long does an Ontario condo board have to respond to an EV charger application?
The condo corporation has 60 days to respond in writing after you submit your application, unless you both agree to extend. If accepted, you have 90 days to sign a written agreement, which is registered on your unit's title.
Do I need an ESA permit to install an EV charger in Ontario?
Yes. ESA says every EV charger installation needs an electrical permit filed before work starts, by a Licensed Electrical Contractor. You receive an ESA Certificate of Acceptance when the work is complete.
Is EV ChargeON open?
No. The Ontario Vehicle Innovation Network lists EV ChargeON as currently not accepting applications. We will update this page if a new intake opens.

Checked November 2026

Ontario Projects

No rebate? Lower running costs.

We size the charger to your panel, file the ESA permit through a licensed contractor, and set up overnight charging. Condo boards get the paperwork they need for O. Reg. 48/01.