Quebec EV Charger Grant

Écorecharge: Quebec's
EV charger grant.

Écorecharge (formerly Roulez vert for charging stations) is the Quebec government's grant for EV charging stations. As of November 2026 it pays $600 toward a home charging station, up to $5,000 for an individual station in a multi-unit building, and 50% of eligible costs for businesses and organizations, up to $500,000 per site and per company. Since April 1, 2026, only connected stations on the eligible list qualify.

$600
Home charging station
$5,000
Individual station, multi-unit
$500,000
Per site, businesses
Checked November 2026. Programs change often · confirm with the official program page before you buy · MÖTEN evfc does not run any government rebate
Four Streams

Who can claim Écorecharge, and how much.

The normative framework has been in effect since March 17, 2026. It has legal force and takes precedence over any summary, including this one.

HomesOpen

Home charging station

$600 grant

For a Quebec resident who owns or leases long term an electric vehicle (battery-electric, plug-in hybrid or electric motorcycle, new or used), at a single-family house, row house, semi-detached house or duplex.

  • Station must be new, Level 2 (208 or 240 V), on the eligible list and connected (invoice dated April 1, 2026 or later)
  • Bought or leased (36 months or more) from a Canadian retailer, invoice in your name
  • You must have paid at least $600 before taxes for the station alone
  • Installation costs are not eligible for this stream
  • Apply after installation, once you have the vehicle; one grant per vehicle
Checked November 2026 · Official source: Home station · Choosing a station · Eligible expenses
Condos and apartmentsOpen

Individual station in a multi-unit building

Up to $5,000

For an EV owner who lives in a multiple dwelling (including triplexes and quadruplexes) and installs a station in the building's parking area.

  • $600 toward the station, plus 50% of eligible installation and electrical infrastructure costs in certain buildings
  • The 50% share depends on building type and construction date, and on the building not already having an Écorecharge infrastructure grant
  • Station must be new, on the eligible list, connected since April 1, 2026, and bought from a Canadian retailer
  • At least $600 paid before taxes for the station; single payment after installation
Checked November 2026 · Official source: Multi-unit individual station · Amount · Eligible stations
Owners and syndicatesOpen

Charging projects in multi-unit buildings

For owners, developers, property managers and condominium syndicate representatives. Subsidized stations must be reserved for residents and their visitors.

  • Charging solution analysis: 75% of eligible expenses, up to $5,000 per building
  • Electrical infrastructure upgrade: 50% of eligible expenses, up to $120,000 per building
  • Station installation: $600 per station installed ($600 per port on multi-port stations); stations on the eligible list, in service at least 36 months
Checked November 2026 · Official source: Projects in multiple dwellings · Analysis · Infrastructure · Stations
Workplaces and organizationsOpen

Businesses, municipalities and organizations

50% of eligible costs

For businesses, municipalities, private organizations and certain public organizations installing Level 2 or DC fast charging.

  • Up to $500,000 per site and per company
  • Level 2: aid cannot exceed twice the station's purchase cost; DC fast: aid cannot exceed the station's purchase cost
  • Work completed after January 1, 2024; all eligible expenses paid before you apply
  • Electrical work by an electrical contractor; labour capped at CMEQ reference rates
  • Businesses that sell, rent, design, repair or make chargers or EVs: limited to two Level 2 stations per establishment
Checked November 2026 · Official source: Business and organization projects (French)

Checked November 2026. Programs change; confirm with the official program page before you buy.

Since April 1, 2026

The connected-station rule.

From April 1, 2026, only connected charging stations are eligible for the home and individual multi-unit grants. Quebec defines a connected station as one that can receive and process remote commands through an app or web application. The date on your purchase or rental invoice decides which rule applies.

What it means for you

Check two things before you buy

  • The exact model is on the Écorecharge eligible list (published in French as a spreadsheet)
  • The model is connected, and your invoice is dated after the rule took effect
Checked November 2026 · Official source: Choosing a station
MÖTEN chargersListing in progress

Connected, listing in progress

MÖTEN Level 2 chargers are networked chargers: OCPP 1.6, 2.0.1 ready, managed in eMÖTEN with a $0 CMS subscription on MÖTEN chargers, and cETLus certified to UL 2594 and CSA C22.2 No. 280. Our Écorecharge listing is in progress, contact us. Being connected is not enough on its own: only listed models qualify.

Checked November 2026. Programs change; confirm with the official program page before you buy.

Installation

RBQ-licensed electrical contractor required.

Quebec's Construction Code requires the electrical work to be done by an electrical contractor holding a licence from the Régie du bâtiment du Québec (RBQ). The Corporation des maîtres électriciens du Québec (CMEQ) publishes a directory of contractors.

Proof for your application

Keep the installation invoice

  • Home grant: include a copy of the installation invoice
  • Plugging into an existing 240 V outlet: send photos as proof instead
  • Dual Level 1 and Level 2 stations: the invoice must say the installation suits Level 2 charging
Checked November 2026 · Official source: Home installation work
Cost drivers

What makes installation cost more

The province notes that costs rise if the electrical panel has to be upgraded or the cable has to be buried. Installation is not covered by the $600 home grant, but it can be in the multi-unit streams. See our Canadian installation guide or request a quote.

Checked November 2026 · Official source: Home installation work

Checked November 2026. Programs change; confirm with the official program page before you buy.

How to Apply

Home grant in five steps.

Applications are made after the station is installed. There is no maximum time between getting the vehicle and applying, but the program must still be running, so the province suggests applying as soon as you are eligible.

  1. Check the list

    Confirm the exact model is on the Écorecharge eligible list and is connected.

  2. Buy new in Canada

    Buy or lease (36 months or more) from a Canadian retailer. Keep the invoice in your name, showing the price actually paid.

  3. Hire an RBQ contractor

    Have an electrical contractor licensed by the RBQ install the station. Keep the installation invoice.

  4. Have the vehicle

    You can install before you buy the car, but you must own or lease the EV when you apply.

  5. Apply online

    Submit your application and invoices through the Écorecharge online services. Payment is a single amount.

Not eligible: stations acquired before January 1, 2024, and stations acquired between February 1 and March 31, 2025, during the Roulez vert suspension. Sources: when to apply, online services.

Checked November 2026. Programs change; confirm with the official program page before you buy.

Frequently Asked

Écorecharge questions.

What is Écorecharge?
Écorecharge is the Quebec government's financial assistance program for EV charging stations, formerly Roulez vert for charging stations. Its normative framework has been in effect since March 17, 2026. It has streams for homes, individual stations in multi-unit buildings, building-wide projects, and businesses and organizations.
How much is the Écorecharge home charger grant?
The home grant is a fixed $600 as of November 2026. You must have paid at least $600 before taxes for the charging station alone, and installation costs are not eligible for this stream.
Does my charger have to be connected for Écorecharge?
Yes. From April 1, 2026, only connected charging stations are eligible for the home and individual multi-unit grants. The date on your purchase or rental invoice decides which rule applies, and the model must also be on the eligible list.
Do I need an RBQ licensed electrician?
Yes. Quebec's Construction Code requires the electrical work to be done by an electrical contractor holding a licence from the Régie du bâtiment du Québec. Keep the installation invoice, because you must include it with your application.
Can I get Écorecharge in a condo or apartment?
Yes. A resident who owns an EV can receive up to $5,000 for an individual station in a multi-unit building. Owners and condominium syndicates can also get funding for charging analyses, electrical infrastructure upgrades and stations for residents.
Is there a deadline to apply after I buy?
There is no maximum time between getting your vehicle and applying, but the program must still be in effect when you apply. Stations acquired before January 1, 2024 are not eligible, so the province recommends applying as soon as you qualify.
Are MÖTEN chargers on the Écorecharge list?
Not yet. Our Écorecharge listing is in progress. If you plan to claim the grant, contact us before you buy and we will tell you the current status.
Does a free CRUX 48 qualify for Écorecharge?
No. The home grant requires at least $600 paid for the station before taxes, and a station obtained free of charge from a business does not qualify. CRUX rewards are separate from the Écorecharge grant.

Checked November 2026

Quebec Projects

Planning a Quebec install?

Tell us your building type and city. We will check the current Écorecharge rules, our listing status and an RBQ-licensed installer for your project.