{"id":13991,"date":"2025-12-05T19:05:24","date_gmt":"2025-12-06T00:05:24","guid":{"rendered":"https:\/\/evfc.com\/?post_type=product&#038;p=13991"},"modified":"2026-11-17T23:49:41","modified_gmt":"2026-11-18T04:49:41","slug":"xeyar-battery-buffered-dc-charger-ca","status":"publish","type":"product","link":"https:\/\/evfc.com\/ca-en\/product\/xeyar-battery-buffered-dc-charger-ca\/","title":{"rendered":"XEYAR Battery Buffered DC Fast Charger, 240 or 360 kW"},"content":{"rendered":"<p>XEYAR is our flagship battery-buffered system. It delivers DC fast charging where the grid connection is too small: on-site battery storage covers the peaks, so the site draws steady average power. Every system is configured for its site, so you can order online or <a href=\"https:\/\/evfc.com\/ca-en\/quote\/\">request a quote<\/a> first.<\/p>\n<h3>Who it is for<\/h3>\n<p>Highway stops, fleet depots and retail sites where a utility service or transformer upgrade would be slow or costly.<\/p>\n<h3>How it works<\/h3>\n<p>Grid power and battery power combine on the XEYAR shared DC bus. The battery recharges between sessions and is run by its own battery management system (BMS), while eM&#xD6;TEN Power, the dynamic load management layer in eM&#xD6;TEN CMS, manages the chargers. Read <a href=\"https:\/\/evfc.com\/resources\/blog\/xeyar-battery-buffered-clusters-skip-panel-upgrade\/\">how XEYAR clusters skip the panel upgrade<\/a>.<\/p>\n<h3>Grid services<\/h3>\n<p>The hardware is VPP-ready. Grid-service (virtual power plant) programs are planned for 2027; we do not quote VPP revenue today.<\/p>\n<h3>Certification and installation<\/h3>\n<p>XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified to UL 2202. Installation follows CEC Section 86 and provincial permits, and your electrical inspector approves each site.<\/p>\n<h3>Specifications<\/h3>\n<table class=\"evfc-spec\">\n<tbody>\n<tr>\n<th scope=\"row\">Power<\/th>\n<td>240 kW, 360 kW or 360 kW liquid-cooled<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Input<\/th>\n<td>480 V AC +\/-15%, 3-phase, 45 to 65 Hz<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Output voltage<\/th>\n<td>200 to 1000 V DC<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Output current<\/th>\n<td>200 A per plug air-cooled; up to 600 A liquid-cooled<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Connectors<\/th>\n<td>CCS1, plus a built-in NACS cable<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Display<\/th>\n<td>7 inch touchscreen<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Connectivity<\/th>\n<td>Wi-Fi, 4G, Ethernet, RFID; OCPP 1.6, 2.0.1 ready<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Enclosure<\/th>\n<td>IP54<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Operating temperature<\/th>\n<td>-40 to +65 &#xB0;C (-40 to 149 &#xB0;F)<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Battery cycle life<\/th>\n<td>Sodium-ion about 20,000 cycles; supercapacitor 500,000+ cycles<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Grid services<\/th>\n<td>VPP-ready hardware; grid-service programs planned for 2027<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Certifications<\/th>\n<td>XEYAR battery storage certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA. Chargers cETLus certified to UL 2202.<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Patent<\/th>\n<td>Patent pending (USPTO and CIPO)<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Lead time<\/th>\n<td>Built to order, 60 to 90 days<\/td>\n<\/tr>\n<tr>\n<th scope=\"row\">Warranty<\/th>\n<td>2-year manufacturer warranty on chargers, in addition to your statutory rights; extendable to 5 years (2 + 3) or 10 years (2 + 8), sold separately; batteries 10 years<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Warranty, shipping and support<\/h3>\n<p>2-year manufacturer warranty on chargers, in addition to your statutory rights. Extendable to 5 years (2 + 3) or 10 years (2 + 8) in total, sold separately. Batteries carry a 10-year warranty. Backed by a 97% uptime SLA. Sales and support every day, 7 a.m. to midnight Eastern. Built to order and delivered in 60 to 90 days. Free shipping anywhere in Canada, with no duties or customs fees at delivery. Prices are shown before tax; GST\/HST is added by province at checkout.<\/p>\n<h3>Frequently asked questions<\/h3>\n<h4>Does a battery buffered charger avoid a transformer upgrade?<\/h4>\n<p>Typically yes, depending on the site: the battery covers peak power so the grid supplies a steady average. Your utility and electrical inspector confirm each site.<\/p>\n<h4>What electrical service does XEYAR need?<\/h4>\n<p>A 480 V three-phase supply. Your licensed electrician and our team size it, and any step-down transformer from a 600 V service, during the site assessment.<\/p>\n<h4>What battery does XEYAR use?<\/h4>\n<p>XEYAR battery storage uses sodium-ion (about 20,000 cycles) or supercapacitor (500,000+ cycles) technology, certified to UL 9540, UL 9540A, UL 810A, IEC 62619 and CSA.<\/p>\n<h4>Can I get a quote before ordering?<\/h4>\n<p>Yes. Most buyers start with a site assessment and a written quote. <a href=\"https:\/\/evfc.com\/ca-en\/quote\/\">Request a quote<\/a> or <a href=\"https:\/\/evfc.com\/ca-en\/contact\/\">talk to sales<\/a>.<\/p>\n<p>Related: <a href=\"https:\/\/evfc.com\/ca-en\/products\/battery-buffered\/\">Battery buffered chargers<\/a> &middot; <a href=\"https:\/\/evfc.com\/ca-en\/products\/dc-fast-chargers\/\">DC fast (Level 3) chargers<\/a> &middot; <a href=\"https:\/\/evfc.com\/ca-en\/charger-management-system\/\">eM&#xD6;TEN CMS<\/a> &middot; <a href=\"https:\/\/evfc.com\/ca-en\/incentives\/\">EV charger rebates and incentives<\/a> &middot; <a href=\"https:\/\/evfc.com\/resources\/blog\/xeyar-battery-buffered-clusters-skip-panel-upgrade\/\">XEYAR battery buffered clusters<\/a> &middot; <a href=\"https:\/\/evfc.com\/ca-en\/quote\/\">Request a quote<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<ul>\n<li>240 kW, 360 kW or 360 kW liquid-cooled<\/li>\n<li>Battery storage covers peak charging power<\/li>\n<li>Typically no transformer upgrade, depending on the site<\/li>\n<li>Patent pending (USPTO and CIPO)<\/li>\n<li>Sodium-ion about 20,000 cycles; supercapacitor 500,000+ cycles<\/li>\n<li>Built to order in 60 to 90 days; free shipping anywhere in Canada<\/li>\n<\/ul>\n","protected":false},"featured_media":13992,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[128],"product_tag":[],"class_list":["post-13991","product","type-product","status-publish","has-post-thumbnail","product_cat-level-3-dcfc-commercial-chargers-with-energy-storage","first","onbackorder","taxable","shipping-taxable","purchasable","product-type-variable"],"_links":{"self":[{"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/product\/13991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/comments?post=13991"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/media\/13992"}],"wp:attachment":[{"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/media?parent=13991"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/product_brand?post=13991"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/product_cat?post=13991"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/evfc.com\/ca-en\/wp-json\/wp\/v2\/product_tag?post=13991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}